AustralianFan Posted January 12 Report Posted January 12 Just now, AustralianFan said: Yes but if the island platform was extended to 450-500m to allow dual 9-car set train operations on each side, with appropriate safety measures, this would increase the capacity of Exhibition Starion to move large Victoria Oark Precinct crowds in and out, effectuvely doubling the capacity of the stadium. It was just a thought, given not much room to add an additonal platform at Exhibition Station which is the closest train station to Brisbane Stadium (63,000) and the Aquatic Centre (25,000) - also given Queensland Government to have ruled out a new train station closer to Victoria Park. Quote
Brisbane Boy Posted January 13 Report Posted January 13 10 hours ago, AustralianFan said: Yes but if the island platform was extended to 450-500m to allow dual 9-car set train operations on each side, with appropriate safety measures, this would increase the capacity of Exhibition Starion to move large Victoria Oark Precinct crowds in and out, effectuvely doubling the capacity of the stadium. AustralianFan please drop the 9 car carriages idea. They won't be in operation by the Olympics It's not just Exhibition Station that would need to be done but the whole network. At a minimum you could try and do stations on one line from start to end. Even that would not get completed in time Regarding Roma Street above ground Platform 10 being 409 meters long as you mentioned. This platform is used for long distance travel through Queensland (1) The Spirit of Queensland (Cairns) nine carriages in total. Six customer, one luggage and 2 power carriages (2) Spirit of the Outback (Longreach) 10 carriages in total (3) The Westlander (Charleville) Just 4 carriages (4) Tilt Train (Electric train Bundaberg/Rockhampton) 8 carriages Any stops these trains make along the way, the platforms would be able to accommodate them. Quote
AustralianFan Posted January 13 Report Posted January 13 Expanding Exhibition Train Station The Courier Mail in the last 72 hours that: Deputy Premier Blejie saying there will be no new train station at Victoria Park, and the Queensland Transport and Main Roads Minister Mickelberg has “implied that more changes to Exhibition station would be made”. As the closest station to Brisbane Olympic Stadium (63,000) and the Aquatic Centre (25,000), changes are most definitely needed at Exhibition Station to cope with the crowds to/from the Victoria Park Precinct. Now with the very space constraints, what changes can be made to Exhibition Station which can handle more frequent trains and bigger crowds? Lateral Expansion? There seems to be no room to add an additional platform adjacent to the current island platform at Exhibition Station. Longitudunal Expansion? Is it possible to extend the length of only Exhibition Station platform to say 450m allow dual train operations on each both sides. For instance, Perth Train Station allows on one of their long platforms to be occupied by two separate trains at the same time. This would increase frequency of trains at Exhibition Train Station. Precious little space to expand Exhibition Train Station on the side of the John MacDonald Stand which is heritage listed. So possiblyexpansion on side show alley side instead? Quote
AustralianFan Posted January 13 Report Posted January 13 6 hours ago, AustralianFan said: Expanding Exhibition Train Station The Courier Mail in the last 72 hours that: Deputy Premier Blejie saying there will be no new train station at Victoria Park, and the Queensland Transport and Main Roads Minister Mickelberg has “implied that more changes to Exhibition station would be made”. As the closest station to Brisbane Olympic Stadium (63,000) and the Aquatic Centre (25,000), changes are most definitely needed at Exhibition Station to cope with the crowds to/from the Victoria Park Precinct. Now with the very space constraints, what changes can be made to Exhibition Station which can handle more frequent trains and bigger crowds? Lateral Expansion? There seems to be no room to add an additional platform adjacent to the current island platform at Exhibition Station. Longitudunal Expansion? Is it possible to extend the length of only Exhibition Station platform to say 450m allow dual train operations on each both sides. For instance, Perth Train Station allows on one of their long platforms to be occupied by two separate trains at the same time. This would increase frequency of trains at Exhibition Train Station. Precious little space to expand Exhibition Train Station on the side of the John MacDonald Stand which is heritage listed. So possiblyexpansion on side show alley side instead? Just a thought anyway. I don’t know if Queensland allow two trains to occupy the same platform one behind the other with appropriate starionary spacing even during event operations, and all the appropriate safety measures, fail safe trip brake measures on the rails, etc in place? Quote
AustralianFan Posted January 14 Report Posted January 14 Olympic Parks 5 hours ago, AustralianFan said: Victoria Park Olympic Precinct Masterplan What would you like to see in the Arup Masterplan for the Victoria Park Olympic Precinct ? A refresh on previous Olympic Parks over the years: Atlanta 1996 Centennial Olympic Park Sydney 2000 Olympic Park . . Athens 2004 Olympic Park Beijing 2008 Olympic Park . . London 2012 Olympic Park Rio 2016 Olympic Park . . Tokyo 2020 National Stadium Paris 2024 Stade de France . . Some of the Games didn’t have an “Olympic Park” per se, such as Paris 2024 and Tokyo 2020. I understand LA2028 won’t have an Olympic Park either. Thankfully Brisbane 2032 will have a thriving, central festival Olympic Park in Victoria Park for tens of thousands visitors and spectators in/around/near Brisbane Olympic Stadium, the National Aquatic Centre and the Brisbane Athletes Village. Quote
AustralianFan Posted January 14 Report Posted January 14 Victoria Park Precinct will be the epicentre and the ‘Olympic Park’ of the Brisbane 2032 Olympic and Paralympic Games. We’re talking here of a multitude if Olympic size events and attractions throughout the Victoria Park Precinct naturally located close to the Brisbane Olympic Stadium, Aquatic Centre and the Athletes Village. As well as ticketed spectators attending events at both venues, this festival atmosphere and attractions will draw in tens of thousands of ticket-less visitors and tourists for the Games experience in the heart of Brisbane. To add to a memorable Olympic / Paralympic fan experience, expect to see a rich program of events, activations, and experiences for everyone within the Victoria Park Precinct, including: Fan Zones / Live Sites Entertainment Stages Olympic / Paralympic Store - merchandise / retail Olympic Expo - each Games usually has this Food and Beverage areas First Nations and Tourism attractions Pop-up television Studios by : NBC Universal (they do this at every Olympics) Nine Entertainment - Host Broadcaster Samsung Olympic experience pavilion (Olympic sponsor) Security Screening at all entry points to the Precinct Looking forward also to see the Victoria Park Precinct Masterplan by Arup. In this interview Andrew Liveris, Brisbane 2032 President, mentions the very marketable fan experience in the Victoria Park Precinct with the Olympic Stadium, Aquatic Centre and Athletes Village nearby: Quote
AustralianFan Posted January 14 Report Posted January 14 3 hours ago, AustralianFan said: Victoria Park Precinct will be the epicentre and the ‘Olympic Park’ of the Brisbane 2032 Olympic and Paralympic Games. We’re talking here of a multitude if Olympic size events and attractions throughout the Victoria Park Precinct naturally located close to the Brisbane Olympic Stadium, Aquatic Centre and the Athletes Village. As well as ticketed spectators attending events at both venues, this festival atmosphere and attractions will draw in tens of thousands of ticket-less visitors and tourists for the Games experience in the heart of Brisbane. To add to a memorable Olympic / Paralympic fan experience, expect to see a rich program of events, activations, and experiences for everyone within the Victoria Park Precinct, including: Fan Zones / Live Sites Entertainment Stages Olympic / Paralympic Store - merchandise / retail Olympic Expo - each Games usually has this Food and Beverage areas First Nations and Tourism attractions Pop-up television Studios by : NBC Universal (they do this at every Olympics) Nine Entertainment - Host Broadcaster Samsung Olympic experience pavilion (Olympic sponsor) Security Screening at all entry points to the Precinct Looking forward also to see the Victoria Park Precinct Masterplan by Arup. In this interview Andrew Liveris, Brisbane 2032 President, mentions the very marketable fan experience in the Victoria Park Precinct with the Olympic Stadium, Aquatic Centre and Athletes Village nearby: for example … Quote
Brisbane Boy Posted January 15 Report Posted January 15 Barring a successful court case this is the expected site of the new stadium By building the majority of the stadium over the treeless golf driving range less trees need to come down Lots of greenspace remaining in the park when using this image angle. I went with this orientation to fit into the image. Could be a different orientation. I erased the driving range platform. Also, erased some of the trees. They were in that lighter washed out area 1 Quote
AustralianFan Posted January 15 Report Posted January 15 12 hours ago, Brisbane Boy said: Barring a successful court case this is the expected site of the new stadium By building the majority of the stadium over the treeless golf driving range less trees need to come down Lots of greenspace remaining in the park when using this image angle. I went with this orientation to fit into the image. Could be a different orientation. I erased the driving range platform. Also, erased some of the trees. They were in that lighter washed out area Excellent. I wonder where the warm-up track will be located. Any news on that? Quote
Brisbane Boy Posted January 16 Report Posted January 16 3 hours ago, AustralianFan said: Excellent. I wonder where the warm-up track will be located. Any news on that? No, but the sites mentioned previously is the likely location. That being in the flat area of the park presently used for sport on the opposite side of Gilchrist Avenue. Best to look at Google Maps to see why this is the likely spot. The venue should remain after the Olympics as an athletics legacy ................................................................................. That flat area mentioned above starts at the VP cricket nets. Location middle right edge on my image. This flat area extends beyond the image to the right and includes 2 rugby fields Using Google Maps and my image above. The three distances in a straight line from same stadium point are: Cricket Nets - 270 meters Closest rugby field to the cricket nets (outside my image) - 260meters Furthest rugby field from cricket nets (outside my image) - 350 meters As VP is very hilly the direct line routes may not be the quickest way to move the athletes I am sure that will be worked out fairly easily 1 Quote
AustralianFan Posted January 16 Report Posted January 16 4 hours ago, Brisbane Boy said: No, but the sites mentioned previously is the likely location. That being in the flat area of the park presently used for sport on the opposite side of Gilchrist Avenue. Best to look at Google Maps to see why this is the likely spot. The venue should remain after the Olympics as an athletics legacy ................................................................................. That flat area mentioned above starts at the VP cricket nets. Location middle right edge on my image. This flat area extends beyond the image to the right and includes 2 rugby fields Using Google Maps and my image above. The three distances in a straight line from same stadium point are: Cricket Nets - 270 meters Closest rugby field to the cricket nets (outside my image) - 260meters Furthest rugby field from cricket nets (outside my image) - 350 meters As VP is very hilly the direct line routes may not be the quickest way to move the athletes I am sure that will be worked out fairly easily We nay not see the warmup track location until the masterplan by Arup is released Quote
Thefix Posted January 22 Report Posted January 22 Fitzroy River, the proposed rowing venue flooded. https://www.brisbanetimes.com.au/national/queensland/proposed-olympic-venue-flooded-with-worst-yet-to-come-20260121-p5nvr2.html Quote Rockhampton is bracing for a flood peak on Thursday morning, as heavy rain from ex-cyclone Koji makes its way down the Fitzroy River – the waterway slated to host Olympic rowing in 2032. Speaking by the banks of the river in the central Queensland city on Wednesday morning, Premier David Crisafulli said while the worst was yet to come, it would fall below the definition of a “major flood level”. OK, for those outside Queensland, this isn't that unusual. The Fitzroy River has a large catchment area - any large monsoonal rainfall in any part of the catchment can cause flooding - and this is the wettest time of year. But with residents being told to keep out of floodwaters due to the possibility of Disease and crocodiles, it won't assuage any concerns about the venue. Quote
AustralianFan Posted January 22 Report Posted January 22 10 hours ago, Thefix said: Fitzroy River, the proposed rowing venue flooded. https://www.brisbanetimes.com.au/national/queensland/proposed-olympic-venue-flooded-with-worst-yet-to-come-20260121-p5nvr2.html OK, for those outside Queensland, this isn't that unusual. The Fitzroy River has a large catchment area - any large monsoonal rainfall in any part of the catchment can cause flooding - and this is the wettest time of year. But with residents being told to keep out of floodwaters due to the possibility of Disease and crocodiles, it won't assuage any concerns about the venue. Also the Games will be held in July/August, not January wet season. Quote
AustralianFan Posted January 22 Report Posted January 22 20 hours ago, Thefix said: Fitzroy River, the proposed rowing venue flooded. https://www.brisbanetimes.com.au/national/queensland/proposed-olympic-venue-flooded-with-worst-yet-to-come-20260121-p5nvr2.html OK, for those outside Queensland, this isn't that unusual. The Fitzroy River has a large catchment area - any large monsoonal rainfall in any part of the catchment can cause flooding - and this is the wettest time of year. But with residents being told to keep out of floodwaters due to the possibility of Disease and crocodiles, it won't assuage any concerns about the venue. 9 hours ago, AustralianFan said: Also the Games will be held in July/August, not January wet season. Olympics 23 July - 8 August Paralympics 24 August - 5 September Rockhampton Dry Season June to September Rockhampton Wet Season December to March Quote
Thefix Posted January 23 Report Posted January 23 Quite right. I don't think the Fitzroy River has even had a major flood in August. I was just saying the fact it is currently is a reminder about the volatility of nature and how it might remind those making the decision about the venue about the risks. 1 Quote
AustralianFan Posted January 26 Report Posted January 26 Developers consulting Athletes re improving conditions at Brisbane 2032 Villages Interesting re concerns raised by athletes about the Paris 2024 Athlete Village as developers seek to improve things in 2032. No air conditioning in the Paris 2024 Athletes Village was startling to hear. Paris can get very hot in summer and so it was in 2024. Another issue was with the uncomfortable cardboard beds used at Paris 2024. The Australian Olympic Team managed to source mattress toppers at the Paris Games for their athletes to maximise rest and high performance. Other athletes talked about the shortage of meat meal options at the Village and the high amount of vegetarian meals, leading to speculation this was to reduce the carbon footprint of the Ganes. History now shows Australia enjoyed it’s highest medal tally in their long history at the Paris 2024 OlympicGames. At LA2028, athletes will be housed in existing facilities and dormitories at USC - University of Southern California. Credit: ABC News Australia Quote
Sir Rols Posted January 27 Report Posted January 27 The aircon was a French cultural thing. But it’s not like aircon is going to be an issue for mid-winter Brisbane - more likely heating gonna be requested for the nights. Quote
AustralianFan Posted January 27 Report Posted January 27 2032 Olympic Mountain Bike competition venue Parklands Conservation Park, Sunshine Coast Today on the Sunshine Coast I took these photos of what I understand will be the Olympic Mountain Bike competition venue at the 2032 Game. How amazing that in just 6 years, the world’s media, the best athletes and thousands of spectators will be flooding this area. >> Googlemaps link to venue << Credit: 2032 Olympic Mountain Bike Venue 1 Quote
AustralianFan Posted January 28 Report Posted January 28 2032 Olympic Venue Alexandra Headland, Sunshine Coast Marathon Kiteboarding Race Walk Road Race - Cycling Time Trial - Cycling What a stunning location for these Olympic Events at Alexandra Headland on the Sunshine Coast. Just took these photos this morning and from past Games menories, imagining the crowds, temporary grandstands, helicopters, camera drones, all the Olympic overlay, etc that will emerge in 2032. Memorable forever 1 Quote
TorchbearerSydney Posted January 28 Report Posted January 28 A non descript beach in a non descript place. Its not exactly Copacabana. And the Games will be mid-winter too. 1 1 Quote
AustralianFan Posted January 28 Report Posted January 28 11 hours ago, AustralianFan said: 2032 Olympic Venue Alexandra Headland, Sunshine Coast Marathon Kiteboarding Race Walk Road Race - Cycling Time Trial - Cycling What a stunning location for these Olympic Events at Alexandra Headland on the Sunshine Coast. Just took these photos this morning and from past Games menories, imagining the crowds, temporary grandstands, helicopters, camera drones, all the Olympic overlay, etc that will emerge in 2032. Memorable forever Race Course Possibilities - Sunshine Coast Stunning scenic aerial shots will be broadcast around the world as the different races progress through the beautiful Sunshine Coast. The actual routes of the Marathon, Race Walk and Cycling Road Races we don’t know yet but there are so many possibilities open to them. For instance, Alexandra Headland to Noosa is 39 kms so it could be a one-way Marathon course. Whether it will start and/or finish at Alexandra Headland remans to be seen. The different distance sports may each have different routes weaving past the Sunshine Coast’s many rolling surf beaches and/or divert inland on roads past the gorgeous wetlands, nature sanctuaries, rivers and forests. Surfing also has a chance of being held on the Sunshine Coast, in competition with the Gold Coast, when the final 2032 sports program is announced mid-2026. 1 Quote
AustralianFan Posted January 29 Report Posted January 29 Model Images of Brisbane Athletes Village Below are rendes and model images of the Brisbane Athlete Village at the RNA Showgrounds from Nathandavid88 on SSC and taken at the annual EKKA show last August. the footprint available for the residential buildings to house the athletes will mean taller towers the Exhibition Train Station is also shown and the new planned 20,000 capacity Showgrounds Arena DSCF0867 by Nathan Murray, on Flickr In the layout above of RNA Showgrounds, below are the explanations of the coloured borders: Red: overall RNA/Brisbane Showgrounds precinct boundary (generally) Yellow: Old Museum Building - not part of the Showgrounds, but has been used as part of the site during the Ekka (Royal Queensland Show) in recent years. May be used during 2032. Blue: Athletes Village Tower Development sites - the majority front O'Connell Terrace & Brookes Street, with one site on Alexandria Street Orange: Exhibition Place - .’Build to Rent’ development currently under construction Green: new infrastructure for the RNA included with the Athletes Village - new Machinery Hill Stands & new Horse Pavilion DSCF0878 by Nathan Murray, on Flickr DSCF0887 by Nathan Murray, on Flickr DSCF0878 by Nathan Murray, on Flickr DSCF0874 by Nathan Murray, on Flickr Quote
AustralianFan Posted February 6 Report Posted February 6 Victoria Park / Barrambin today Back in Brisbane today, beautiful sunny weather, and decided to take a stroll through Victoria Park to see where these preliminary stadium exploratory earth works are located. Well, I criss-crossed everywhere no sign of them nor fenced of areas anywhere in the Park - so I guess they packed everything up once they had all the data they needed. So … still have no idea where the Stadium will be. Found a big flock of relaxed Ibis birds (bin chickens) though camped near the water enjoying themselves in the shade . On the other side of the park, lots of golf balls flying through the air at the packed driving range - turns out I was directly in their line of fire but thank goodness the tall netting was there. So yes, the Stadium builders most certainly do have a lot of levelling to do whereever both the Olympic Stadium and the warm-up track are each located. Overall, a very pretty park and a lot more hilly than I thought. Had the equetrian cross country remained here, it would have been a very testing course indeed. After the park walk, I headed walked to near the RNA Showgrounds (athletes village) along the main path and under ths busway near Herston Bus Station. Didn’t take long, if they find a way to use Exhibition Train Station for spectators and visitors. Anyway, here’s some photos. Quote
AustralianFan Posted February 6 Report Posted February 6 3 hours ago, Brisbane Boy said: #EXCLUSIVE: Tonight, we're now one step closer to knowing who will build Brisbane Stadium. #9News | 9 News Queensland | Facebook So the five construction companies in the running to build the Brisbane Olympic Stadium are: webuild Samsung C&T Built CPB BESIX Watpac Quote
AustralianFan Posted February 9 Report Posted February 9 World Rowing rejects Rockhampton Rowing Venue According to this report in today’s The Australian, World Rowing has rejected the Fitzroy Ruver flat water rowing venue in Rockhampton. The Queensland Government is preparing to move rowing to another venue and perhaps soften the blow in Rockhampton by offering another sport to be based there such as Netball. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.