Stadium progress


Recommended Posts

The numbers:


BEL |..................Ready|

FOR |..................Ready|


SAL |...................95%.|

REC |..................90%..|

BRA |..................89%..|

RIO |................80%....|*

SAO |.............64%.......|

CUI |............62%........|

POR |............58%........|

CUR |...........56%.........|

MAN |..........52%..........|

NAT |..........50%..........|


* This number is from november. The consortium has not updated the information since then. By the progress, the stadium surely surpassed 90%.
Link to comment
Share on other sites

  • 2 weeks later...
  • Replies 1.1k
  • Created
  • Last Reply

FORTALEZA

Arena Castelão

FINISHED

164463_587253341303789_1570987914_n.jpg

BELO HORIZONTE

Mineirão Stadium

FINISHED

8449701324_f57088bbff_z.jpg

SALVADOR

Arena Fonte Nova

8514380332_2f807c5c13_b.jpg

RIO DE JANEIRO

Maracanã Stadium

maracanabrasil.jpg

BRASÍLIA

Estádio Nacional

IMG_6691.JPG

RECIFE

Cidade da Copa

420317_303642009762493_1437189435_n.jpg

SÃO PAULO

Arena de São Paulo

b04+c%C3%B3pia.jpg

CURITIBA

Arena da Baixada

tn_620_600_Arena_270213.jpg

PORTO ALEGRE

Beira Rio Stadium

11199_141122276055578_1024230922_n.jpg

NATAL

Arena das Dunas

dscf6882.jpg



MANAUS

Arena da Amazônia

8499640725_ca0011520b_b.jpg

CUIABÁ

Arena Pantanal

2001681_big-lnd.jpg

Link to comment
Share on other sites

Update:

BEL |..................Ready|
FOR |..................Ready|
SAL |....................99%|
REC |...................95%.|
BRA |..................92%..|
RIO |..................87%..|
SAO |.............65%.......|
CUI |............62%........|
POR |............58%........|
NAT |...........57%.........|
CUR |...........56%.........|
MAN |...........54%.........|
Salvador allmost ready!
8516704410_a9672cf023_b.jpg
8515591461_c6c2ec3355_b.jpg
8515595009_eded548d45_b.jpg
8513272497_f6d4cc4979_b.jpg
8514383074_d04f2fa8a6_b.jpg
8513272609_27b5bb3631_b.jpg
Link to comment
Share on other sites

The famous "águas de março" of Rio de Janeiro take their toll at Maracanã - and the stadium's construction progress causes the "biggest worry" for FIFA general-secretary Jérôme Valcke:

NBC Sports: FIFA Visit to Maracana canceled because of floods

Hmmm... so this is apparently becoming a nailbiter like the construction of the refurbished Athens Olympic Stadium in 2004. But in the end, they managed to finish that in time, too.

Link to comment
Share on other sites

Time to follow this project more closely. Interesting. They will finish it on time, no doubt about it. But they really have to speed up. Always nice to have a little drama during the build-up to a tournament.

Good thing they've prevented a third strike (or fourth or fifth, how much is it?)

Time to rewrite and add some things do this article:

http://www.worldcupofjoe.com/1/post/2013/01/the-maracan-way.html

Link to comment
Share on other sites

Your site is cool. But some things are not updated, as the picture of Fortaleza stadium, which have already been completed and also the stadium capacities.

I think you should also update the information about the Maracana. The government of Rio said yesterday that the stadium will be completed next month, despite the problem with the rain. The date of May 28 is when "ALL" the CC stadiums shall be delivered to the FIFA administration. The press here was mistaken stating that the stadium would be ready only in May.

Link to comment
Share on other sites

The famous "águas de março" of Rio de Janeiro take their toll at Maracanã - and the stadium's construction progress causes the "biggest worry" for FIFA general-secretary Jérôme Valcke:

NBC Sports: FIFA Visit to Maracana canceled because of floods

Hmmm... so this is apparently becoming a nailbiter like the construction of the refurbished Athens Olympic Stadium in 2004. But in the end, they managed to finish that in time, too.

No single line about the billion-dollar works to avoid floodings in the Maracana area, to be inaugurated in november.

Two underground rivers will get detours and a underground "pool" is under final works to store the flooded waters...

Maybe one of the biggest legacies of the World Cup in Rio, but this is not interesting to publish in the Int'l media...

Link to comment
Share on other sites

Pictures of the works to solve floodings near Praça da Bandeira area

8534327568_6d4805a0b2_b.jpg

8533217181_4878a3260c_b.jpg

The pictures were taken by Brazilian forumers of SSC after the flodding in Maracana just to prove works have been done to solve this problem definitvely. That's why the look of the pictures are a mess of mood.

This is not the actual like of the works around Maracana, as you can see in these pics from a week ago:

DSC00525_zps8ab6cd45.jpg

DSC00520_zps103e9c3c.jpg

DSC00399_zpsa969fd71.jpg

DSC00512_zps0849ee88.jpg

Link to comment
Share on other sites

Salvador handed the third stadium for the 2014 World Cup!

The first match of the Fonte Nova will be played on April 7:

http://globoesporte.globo.com/ba/noticia/2013/03/fonte-nova-e-entregue-ao-governo-e-imprensa-conhece-espacos-internos.html



8540802728_326311b26c_b_d.jpg
Soon I'll post more pictures
Link to comment
Share on other sites

8540484196_7bd9494668_b_d.jpg

8539378169_ef61a6afd0_b_d.jpg
8539378563_f903c46781_b_d.jpg
8540603028_30c9763e59_b_d.jpg
8542126412_f1d11a81ee_b.jpg
fonte_nova_-_estadio.jpg
fonte_nova_-_estadio-3.jpg
fonte_nova_-_dependencias-8.jpg
fonte_nova_-_vestiario.jpg
fonte_nova_-_banco_de_reservas.jpg
fonte_nova_-_dependencias-9.jpg
2013-03-08_Press%20Tour%20Arena%20Fonte%
BEL |...................100%|
FOR |...................100%|
SAL |...................100%|
REC |...................95%.|
BRA |..................92%..|
RIO |..................87%..|
SAO |.............66%.......|
CUI |............62%........|
POR |............62%........|
NAT |...........57%.........|
CUR |...........56%.........|
MAN |...........54%.........|
Link to comment
Share on other sites

Whohoo! 3 out of 12 stadiums completed. Congrats to Salvador. Are they going to build the temporary stand in the empty space for the confederations cup too, or just for the world cup?

The installation of temporary seats will begin on march 18 and will be ready for te confederations cup.

Link to comment
Share on other sites

No single line about the billion-dollar works to avoid floodings in the Maracana area, to be inaugurated in november.

Two underground rivers will get detours and a underground "pool" is under final works to store the flooded waters...

Maybe one of the biggest legacies of the World Cup in Rio, but this is not interesting to publish in the Int'l media...

Well obviously none of that is working yet.

Link to comment
Share on other sites

Well obviously none of that is working yet.

Of course, since the detour of the rivers and the "pool" are under works...

But, after 50 years of March/April single-day rain floodings in the area, the problem is now addressed.