Stadium progress


Recommended Posts

  • Replies 1.1k
  • Created
  • Last Reply

Updating:

BEL |....................99%|
FOR |....................99%|
SAL |.................85%...|
BRA |.................84%...|
RIO |................80%....|
REC |...............77%.....|
SAO |............58%........|
CUR |...........54%.........|
POR |..........52%..........|
CUI |..........50%..........|
MAN |.........47%...........|
NAT |.........45%...........|
Link to comment
Share on other sites

Brazil unveils first stadium for 2014 World Cup

empty.gif

The Castelao Arena in the northeastern Brazilian city of Fortaleza became the first stadium to be inaugurated for the 2014 World Cup finals on Sunday.

empty.gif

Along with the Mineirao in Belo Horizonte, to be opened on December 21, they are the only stadiums to meet the December 2012 deadline set originally for next year's Confederations Cup, a World Cup finals dress rehearsal.

President Dilma Rousseff attended the opening ceremony at the Castelao, which has been completely refurbished at a cost of 518.6 million Brazilian reals ($249.18 million) with a capacity for 67,000.

17brazil-wc-stadium-launch.jpg

Brazil's President Dilma Rousseff (in red) kicks a soccer ball during the inauguration of the Arena Castelao in Fortaleza on Sunday. The Arena Castelao is the first stadium ready for World Cup 2014

Photograph: Reuters

...

http://www.rediff.com/sports/report/brazil-unveils-first-stadium-for-2014-world-cup-football/20121217.htm

Link to comment
Share on other sites

Mineirao construction completed

12/21/2012

Brazil, Minas Gerais: December 21, 2012: This Friday the 21st, the construction completion ceremony for the Governador Magalhães Pinto Stadium, Mineirão, will be held. The stadium, which was renovated for the 2014 FIFA World Cup, will be one of the Rio 2016™ Olympic Games football headquarters.

The Mineirão closed for two and a half years and is ready right on time. Thanks to the renovation, the stadium counts 64 thousand seats, 90 box seats, a restaurant with a view of the field and VIP area lounges. The parking area counts 2.8 thousand spaces and the press area has a 3 thousand journalist capacity.

Now, the stadium has an esplanade, an 80 thousand m2 outdoor area with a 65 thousand person capacity around the stadium. It will be one of the great public spaces in Belo Horizonte, a suspended park with seven thousand m2 for commercial activities, with restaurants, bars and shops.

Among the amenities of the New Mineirão is the roof equipped with technology to capture solar energy and transform it into electricity. In addition, rainwater is reused. The stadium also counts a six million litre reservoir, able to supply part of the Mineirão for three months.

For more information contact: Rio 2016™ Organising Committee for the Olympic and Paralympic Games

www.rio2016.com

Media Relations

mediarelations@rio2016.com

Tel: +55 21 3433 5826

Link to comment
Share on other sites

Salvador

8293629869_71bcca6f56_b_d.jpg
8294686584_c2f2116839_b_d.jpg
8294686074_3a91c21391_b_d.jpg
8293631177_c54d50ffa3_b_d.jpg
8294684990_853fa47503_b_d.jpg
8294684860_227de304a5_b_d.jpg
Updating
BEL |..................Ready|
FOR |..................Ready|
SAL |..................87%..|
BRA |.................84%...|
RIO |................80%....|
REC |...............77%.....|
SAO |............60%........|
POR |.......... 55%.........|
CUR |...........54%.........|
CUI |..........50%..........|
MAN |..........50%..........|
NAT |..........50%..........|
Link to comment
Share on other sites

When is Salvador gonna be ready?

The conclusion of the Arena Fonte Nova was scheduled for December 2012 but due of FIFA requirements, according to the consortium responsible for the works, the deadline was postponed. Now, the reopening is scheduled for Feb. 28.

(google translate)

A conclusão da Arena Fonte Nova estava prevista para dezembro de 2012, mas, por causa de exigências da Fifa, segundo o consórcio responsável pelas obras, o prazo foi adiado. Agora, a reinauguração está prevista para o dia 28 de fevereiro.

...

http://esportes.terra.com.br/futebol/fonte-nova-tem-nova-data-de-

reinauguracao,f03c471cd26fb310VgnCLD2000000dc6eb0aRCRD.html

Link to comment
Share on other sites

The conclusion of the Arena Fonte Nova was scheduled for December 2012 but due of FIFA requirements, according to the consortium responsible for the works, the deadline was postponed. Now, the reopening is scheduled for Feb. 28.

(google translate)

reinauguracao,f03c471cd26fb310VgnCLD2000000dc6eb0aRCRD.html

Thanks for the info. That's nicely on time for the Confederations Cup. Are the other three Confederations Cup stadiums also on schedule or are there problems with some?

With the other three i mean the three stadiums that aren't finished yet. So Brasilia, Recife and Rio.

Link to comment
Share on other sites

Danyel, the big lift has begun (since december 19) and there have been considerable advances on the roof. The cables are already in the final height and almost all of those diamond shaped pieces which were in the field have been installed. I think the problem is that the press isn't following the progress of the works.

Here is some pics of online camera from odebrecht (taken today):

maraca1.jpg

maraca2.jpg

Link to comment
Share on other sites

Shame on me!!!

How dare I got so misinformed about Maracana???

:blink:



Brasília

These pictures show how impressive is our new National Stadium!!!

2isi6wg.jpg

2vcgfbm.jpg



Salvador's Fonte Nova

179581_3900409623037_479631973_n.jpg

1212_salvador_aerea_arena_0269.jpg



Recife's Cidade da Copa

WOW - How fast this work is!!!

dez2_zpse871d508.png

dez22_zps862e8eae.png

Link to comment
Share on other sites

In fact there are more updated pics on Salvador, with some of the roof installed and the blue-green teal chairs installed. I just kind if forget how to post images here =\